Standard Thickness of Stone Crete Plaster is 8mm OR 10 mm OR 15mm. As per the size of the aggregates, it will change.Most running thickness is 8 mm.
For Pedestrian (Walkways) – 15mm.
For Light Vehicle – 20mm OR 25mm as per requirements.
For Heavy Vehicle –This product is not advisable.
Yes, Grooves are mandatory to give expansion joint grooves, after every 2 meters. (Total size of the panel should not be more than 36 to 40 square feet in each panel, wheatear it is vertical or horizontal)
You don’t have to do grooves. Our application team will do the grooves as per requirements.
It can be done 200 Square Feet in single day.
No. It can be start only after rain stops
No. Only Authorized trained applicator can do it
For proper bonding of Stone Crete Plaster, the base plaster surface should be rough. Marked by combing the surface with wavy lines using a wire brush or nail comb. The base should be hard and properly cured for a minimum of 5 to 6 days.
For proper bonding of Stone Crete flooring OR Pebble Stone Flooring, it requires: Levelled PCC flooring surface with market by combing the surface wavy lines using a wire brush or nail comb.
Usage of Balaji Wall Texture sealer topcoat minimizes dust accumulation.
The project is in Karnataka: Minimum order quantity should be 3000 Square Feet. AND The project is in other state: Minimum order quantity should be 10,000 Square Feet.
Minimum 2 weeks after the receipt of advance payment.
Yes, we can do if the project work quantity is more than 10,000 Square Feet.
You can visit our Bangalore Experience Center with prior appointment. If you are from out station, we can provide soft copies of the product & you can buy the product samples as per requirements. You must pay for those samples. You can refer our Order Sample webpage.
It’s a permanent finish. Maintenance is requiring after certain years.